With the deepening of the concept of environmental protection, the requirements of residents for domestic water are increasing. Therefore, the cleanliness of water has gradually become the focus of attention.It can meet the mobile transportation requirements of the equipment, and its structure is convenient for the installation and maintenance of the equipment. According to the customer's requirements, the box body can be heat preservation, heat dissipation, noise reduction and other treatment. It can also be customized according to the needs of customers or provide practical and effective solutions.
Water source monitoring, testing laboratory of professional organization, mobile monitoring station, etc
20GP | Dimensions | MM | FT - IN |
Externel | Length | 6058 | 20 ’ |
Width | 2438 | 8 ' | |
Height | 2591 | 8 ' - 6 " | |
Internal | Lenght | 5800 | 19 ' - 4 13/64 " |
Width | 4400 | 7 ' - 8 19/32 " | |
Height | 2600 | 7 ' - 10 7/32 " | |
Door Opening | Width | 2200 | 7 '- 8 1/8 " |
Height | 2450 | 7 ' - 5 49/64 " | |
CU.M | CU.FT | ||
Inside Cubic Capacity | 33.2 | 1170 |
Material :Used/NewShipping Container
Exterior color :Color customization.
Internal wall and specification :Sound insulation material + stainless steel mesh plate
Floor: Patterned steel plate
Door :Fire door /special customization
Voltage Standard :Customize By Local Voltage Standard
Vent: According to customer requirements
1: The manufacturing cycle of the box is short and the service life is long
2: Easy to lift and move
3: Container process strength, suitable for the installation of large power equipment,
4:Design drawings according to equipment model and usage
5. Activity: mobile and reusable
6. Rapid establishment: short manufacturing period and no foundation.
7. Safety: steel structure, strong and durable.
8. Durability: steel plate outer wall, no rust, no crack, service life more than 20 years.
9. Sound insulation and heat insulation: air cut-off heat design is adopted, with good sound insulation and heat insulation.
STEP 1
The factory determines the delivery time and leases the booking to the shipping company.
STEP 2
Provide export clearance documents and related expenses.
STEP 3
The factory sealed the box and shipped it to the port three days in advance.
STEP 4
The goods leave the port of shipment and are shipped to the port of destination.
STEP 5
Received the shipping company's delivery notice and proceeded with customs formalities in advance.
STEP 6
The goods orrive ot the port of destination and are picked up according tothe bill of lading.
1. Q: Is Shanghai Shiyi a factory or a trading company?
A: Shanghai Shiyi is a container housing, which is located in Baoshan District, Shanghai. Shanghai Shiyi devotes itself to manufacture and renovate the container house since 2013. The workshop of Shanghai Shiyi is accessible to everyone for visiting purpose.
2. Q: How can I get a quotation of the project?
A: If you have your own drawing, we can offer you a quotation according to your design. If you don’t have any draft, our designers will assist you.
3. Q: Does the electric power system work in my country?
A: Our electric power systems are standardized in USA, AU and EU.
4. Q: How to install the containers?
A: We will sent you an installation instruction and video. If you still need help, we can provide on-site service. However, any other extra fees may applied.
CONTACT US AT ANY TIME