20ft prefabricated container gym:When you walk into the container, a mini gym with a strong sense of modernity will appear in front of you. Its area is not large, about 40 square meters. It is equipped with treadmill and other sports equipment, and also provides shower and other supporting services. It can meet the city people's needs of running, strength training, aerobics, yoga and other fitness.
It can be used as residence, gym, shop, etc.
20HC | Dimensions | MM | FT |
Externel | Length | 6058 | 20 |
Width | 2438 | 8 | |
Height | 2896 | 9.5 | |
Open Internal | Lenght | 5800 | 19 |
Width | 4400 | 14.4 | |
Height | 2600 | 8.5 | |
Expansion Part | Lenght | 5800 | 19 |
Width | 2200 | 7.2 | |
Height | 2450 | 8..03 | |
SQ.M | |||
Total Area | 20 | ||
Use Area | 15 | ||
T | LBS | ||
Maximum Payload | 22 | 48016 | |
Net Weight | 4.6 | 11041 |
1. Replace traditional building materials, realize housing industrialization and improve human living environment. Container housing can not only replace the traditional living mode, but also make full use of the building materials produced by industry. The housing in the
21st century is environment-friendly and energy-saving. They replaced wood with steel, bricks with steel, and concrete with steel. Products that improve the living environment of human beings.
2. The ideal container structure residence adopts brand-new or second-hand containers, with appropriate decorative materials, which can be constructed according to the environment and the user's preference, so as to achieve an ideal and comfortable living environment.
3. On the basis of using containers, the container house is supplemented with thermal insulation and environmental protection materials, which is fully in line with the modern people's environmental protection concept of good thermal insulation performance and outstanding energy-saving effect. At present, it is a residential product with remarkable energy-saving effect.
4 has good plasticity, suitable for different scenes and uses, and can also be used in DIY.
STEP1 | The factory determines the delivery time and leases the booking to the shipping company. |
STEP2 | Provide export clearance documents and related expenses. |
STEP3 | The factory sealed the box and shipped it to the port three days in advance. |
STEP4 | The goods leave the port of shipment and are shipped to the port of destination. |
STEP5 | Received the shipping company's delivery notice and proceeded with customs formalities in advance. |
STEP6 | The goods orrive ot the port of destination and are picked up according tothe bill of lading. |
1. Q: Are you a factory or trading company?
A: Shanghai Shiyi Industrial is a factory, located in Baoshan District, Shanghai. Factory is open to client and welcome to visit.
2. Q: How can I get the quotation of the project ?
A: If you have drawing ,we can offer you our quotation according to your drawing . If you have no design , Our engineer will design some drawings for you to confirm. And then offer you a quotation.
3. Q: How about the electric power system, does it suit to my country?
A: Yes, we would has 3 standard electric power system, they are USA, AU and EU.
4. Q:How to install ?
A: We will provide installation instruction and video for you, technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation,wages will be provided by buyers.
5. Q: How do you guarantee the quality of the products?
A: Strict product quality control, quality makes the future.This is the tenet of our factory. Each product from our factory has strict testing procedures, and must be 100% quality before delivery.
6.Q: What's your supply capacity?
A: One container house usually needs 35 days at least, and luxury container house needs more 10-15 days.
7. Q: How about the shipping?
A: We usual transport by the shipping, and if you want to know the price, we could help you check from the shipping agent for the freight.
CONTACT US AT ANY TIME