You ask me what the theme of the future is, there is no doubt that it is environmental protection. In order to carry out this idea, many things came into being. The water treatment container transformed from the container is one of them. It can be transformed from the old container. The use function is to improve the water cleanliness. At the same time, the box has the functions of heat preservation, noise reduction and heat dissipation. It has the mobility of container and can be customized according to the requirements of customers.
Dimensions--External | 40' GP |
Length: | 12,192 mm |
Width: | 2,438 mm |
Height: | 2,591 mm |
Dimensions--Internal | |
Length: | 12,036 mm |
Width: | 2,350 mm |
Height: | 2,348 mm |
Dimensions--Door and Roof Openings | |
Minimum Door Opening Width: | 2,340 mm |
Minimum Door Opening Height: | 2,280 mm |
Minimum Roof Opening: | |
Width Between Top Rails | 2,232 mm |
Length Between Top Headers | 11,798 mm |
Length Between Troughs | 11,512 mm |
Weight & Payload | |
Tare Weight (Design Estimate): | 3,800 kg |
Maximum Gross Weight: | 30,480 kg |
Minimum Net Weight: | 26,680 kg |
Stacking | |
Stacking Test Load per Post: | 96,012 kg |
1: The manufacturing cycle of the box is short and the service life is long
2: Easy to lift and move
3: Container process strength, suitable for the installation of large power equipment,
4:Design drawings according to equipment model and usage
5. Activity: mobile and reusable
6. Rapid establishment: short manufacturing period and no foundation.
7. Safety: steel structure, strong and durable.
8. Durability: steel plate outer wall, no rust, no crack, service life more than 20 years.
9. Sound insulation and heat insulation: air cut-off heat design is adopted, with good sound insulation and heat insulation.
STEP 1
The factory determines the delivery time and leases the booking to the shipping company.
STEP 2
Provide export clearance documents and related expenses.
STEP 3
The factory sealed the box and shipped it to the port three days in advance.
STEP 4
The goods leave the port of shipment and are shipped to the port of destination.
STEP 5
Received the shipping company's delivery notice and proceeded with customs formalities in advance.
STEP 6
The goods orrive ot the port of destination and are picked up according tothe bill of lading.
1. Q: Is Shanghai Shiyi a factory or a trading company?
A: Shanghai Shiyi is a container housing, which is located in Baoshan District, Shanghai. Shanghai Shiyi devotes itself to manufacture and renovate the container house since 2013. The workshop of Shanghai Shiyi is accessible to everyone for visiting purpose.
2. Q: How can I get a quotation of the project?
A: If you have your own drawing, we can offer you a quotation according to your design. If you don’t have any draft, our designers will assist you.
3. Q: Does the electric power system work in my country?
A: Our electric power systems are standardized in USA, AU and EU.
4. Q: How to install the containers?
A: We will sent you an installation instruction and video. If you still need help, we can provide on-site service. However, any other extra fees may applied.
CONTACT US AT ANY TIME