1. The size of container office is standardized. As the container needs to be transported by sea and land, its external size is strictly limited.
Objectively speaking, the construction of container room is closely related to the size of existing containers. In addition to the special customization of individual containers, most of the container sizes are standard and uniform.
2. The structure of container room is stable and safe, and the service life of container transportation is 10-15 years.
After being eliminated by the transportation industry, containers that are not damaged can usually be guaranteed for more than 15 years, and the structural period can last longer when they are kept in good condition or used with other structures such as concrete.
20GP | Dimensions | MM | FT - IN |
Externel | Length | 6058 | 20 ’ |
Width | 2438 | 8 ' | |
Height | 2591 | 8 ' - 6 " | |
Internal | Lenght | 5800 | 19 ' - 4 13/64 " |
Width | 4400 | 7 ' - 8 19/32 " | |
Height | 2600 | 7 ' - 10 7/32 " | |
Door Opening | Width | 2200 | 7 '- 8 1/8 " |
Height | 2450 | 7 ' - 5 49/64 " | |
CU.M | CU.FT | ||
Inside Cubic Capacity | 33.2 | 1170 | |
KG | LBS | ||
Maximum Gross Weight | 24000 | 52910 | |
Tara Weight | 2220 | 4890 | |
Maximum payload | 21780 | 48020 | |
Maximum payload | 192000 | 423280 |
Material display
1. Basic materials: new / old Marine Containers
2. Thermal insulation materials: rock wool, PS extruded board, color steel sandwich panel
3. Wall panel and top materials: UV board, aluminum plastic board, bamboo wood fiber board, metal carving board
4. Auxiliary materials: wood board, cement board, gypsum board, OSB board, calcium carbonate board, PVC floor, wood plastic panel, perforated mesh board
In recent years, with the high house prices in China, it has brought a huge economic crisis to individuals and enterprises. The new container office follows the trend of the times. It meets the office needs of small enterprises. Moreover, it is no worse than the office building in the transformation design of the container office.
So come and see our office containers!!
STEP 1
The factory determines the delivery time and leases the booking to the shipping company.
STEP 2
Provide export clearance documents and related expenses.
STEP 3
The factory sealed the box and shipped it to the port three days in advance.
STEP 4
The goods leave the port of shipment and are shipped to the port of destination.
STEP 5
Received the shipping company's delivery notice and proceeded with customs formalities in advance.
STEP 6
The goods orrive ot the port of destination and are picked up according tothe bill of lading.
1. Factory direct sales
2. Support customized production services
3. Professional design team can provide housing design service
4. After sales service
5. With pictures or text, according to your ideas
CONTACT US AT ANY TIME